Audit procedure

29.11.2026

1 Purpose and Scope

1.1

This Regulation establishes the organizational framework, objectives, and general rules for planning, conducting, and documenting audits based on the standards ISO/IEC 17021-1:2017 and ISO/IEC 19011:2018.

1.2

The provisions of this procedure apply to both internal and external audits.

1.3

The provisions of this procedure regarding the planning, organization, and conduct of audits are mandatory for application by the Certification Body.


2 Terms and Definitions

2.1

This document uses the following terms and definitions in accordance with ISO/IEC 9000 and ISO/IEC 19011:2018:

  • Audit — a systematic, independent process for obtaining audit evidence and objectively evaluating it to determine the extent to which agreed audit criteria are fulfilled.

  • Auditor — a person with the competence to conduct an audit.

  • Audit team — one or more auditors conducting an audit, supported by technical experts where necessary.

  • Corrective action — action taken to eliminate the cause of a detected nonconformity or other undesirable situation.

  • Audit criteria — a set of policies, procedures, or requirements used as a reference against which audit evidence is compared.

  • Nonconformity — non-fulfillment of a requirement.

  • Audit scope — the extent and boundaries of an audit.

  • Audit object — a department (or several departments) of the organization performing activities within the quality management system as a whole or in part.

  • Audit plan — a description of activities and arrangements for conducting an on-site audit.

  • Preventive action — action taken to eliminate the cause of a potential nonconformity or other potentially undesirable situation.

  • Audit program — a set of one or more audits planned for a specific time frame and directed toward a specific purpose.

  • Audit evidence — records, statements of fact, or other information relevant to the audit criteria and verifiable.

  • Expert — a person who provides specific knowledge or expertise to the audit team.


Audit Objectives

The audit is conducted in order to:

  • confirm compliance with requirements established by external regulatory documents and QMS documentation;

  • collect fact-based audit evidence;

  • confirm achievement of quality and Halal objectives;

  • confirm elimination of identified nonconformities and implementation of corrective actions;

  • identify strengths and weaknesses of the Quality Management System (QMS);

  • identify opportunities for improvement.


3 General Provisions for Audit Conduct

3.1

Audits are conducted in accordance with the Audit Program of the Certification Body.

3.2

Audits of objects for which Halal standards do not require a mandatory Stage 1 on-site audit may be conducted remotely using appropriate electronic means by auditors with the required level of competence, including cases of scope expansion.

3.3

For certain categories of Halal standards, Stage 1 audits are conducted on-site.

3.5

For objective reasons preventing on-site visits, audits may be conducted remotely.

3.6

Audits may be conducted on an unscheduled basis. An unscheduled audit may be initiated due to:

  • significant deviations in the QMS;

  • the need to assess the effectiveness of corrective actions;

  • significant changes in the organizational structure;

  • repeated complaints and appeals;

  • confirmation of continuous operation of the QMS, including Halal requirements.

Note:
On-site audits may include remote access to electronic platforms containing information relevant to the audit scope. The use of electronic means for conducting audits may also be considered.


4 Organization of the Audit

4.1

An audit team and an audit team leader are appointed by order of the Head of the Certification Body.
The team is formed in coordination with the Head of the Expert Department from among auditors with appropriate competence in accordance with the personnel selection procedure and the required category, with the mandatory inclusion of an Islamic expert.

4.2

Accompanying persons and observers may accompany the audit team with the consent of the audit team leader or the audited organization, where required.


5 Preparation for the Audit

5.1

The audit preparation stage includes:

  • analysis of applicable regulatory documentation of the management system and compliance with Halal standards;

  • preparation of the audit plan considering the organizational structure and process flowcharts (standard audit plan, Appendix A);

  • preparation of the audit checklist.

5.2

The audit plan includes:

  • name of the auditee;

  • audit scope;

  • audit objectives;

  • audit date;

  • audit normative basis (audit criteria);

  • audit team composition;

  • audit objects (structural units) and audited processes.

The audit plan is sent to the audited organization no later than 7 days before the scheduled on-site audit date for approval.


6 Conduct of the On-Site Audit

6.1

The audit includes an opening meeting with representatives of the audited organization, during which the audit team leader:

  • introduces the audit team members;

  • confirms the audit objectives, scope, and criteria;

  • confirms the audit schedule (order and timing);

  • explains the audit methods.

6.2

The on-site audit includes:

  • information collection;

  • sampling and verification of information;

  • conduct of the closing meeting.

6.3

Methods of information collection:

  • interviews;

  • document review;

  • observation of activities.

6.4

The closing meeting is conducted by the audit team leader with the management of the audited organization and audit participants, during which:

  • main nonconformities identified during the audit are presented;

  • recommendations for improvement opportunities are provided;

  • preliminary audit conclusions are presented;

  • timelines and methods for submission of the audit report are agreed;

  • subsequent actions of the parties are explained;

  • where necessary, timelines for verification of corrective actions are agreed.

All nonconformity findings shall be presented and analyzed jointly with the audited organization.
Nonconformities must be clearly understood, and unresolved issues shall be recorded in the audit report.


7 Preparation, Approval, and Distribution of the Audit Report

7.1

The audit team leader collects information obtained by the audit team members during the on-site audit in any form (written or oral).

7.2

Based on the collected information, the audit team leader prepares the audit report (Appendix B), including audit evidence, nonconformities, and recommendations.

7.3

The audit report is prepared by the audit team leader, who is responsible for its completeness and accuracy.

7.4

The audit report provides clear and sufficient audit records and includes:

  • audit objectives and scope;

  • identification of the audit team leader and members (full name, position);

  • date and location of the audit;

  • audit results (degree of plan fulfillment, nonconformities, number of nonconformities, sampling and identification if applicable);

  • audit conclusion (including deadlines for submission of the corrective action plan and corrective action report).

7.5

The audit report is submitted to the Certification Decision Committee and, after unanimous approval, is sent to the audited party within 7 calendar days.


8 Actions Based on Audit Results

8.1

Based on the audit report, the audited party shall submit a Corrective Action Plan within 7 calendar days.

8.2

If nonconformities are identified, the audited party shall submit the Corrective Action Plan within 7 calendar days, and evidence of elimination of nonconformities shall be submitted to the Certification Body within 30 calendar days.


If you need, I can also:

  • adapt this translation to ISO-style wording used by UKAS / EIAC / GAC,

  • prepare a bilingual (RU–EN) version,

  • or align terminology strictly with ISO/IEC 17021-1 audit procedures.

Start certification today!

Submit a request